3. Right after rig positioning, generate the casing into the bottom. Travel metal casing to your minimum amount a depth of one m underneath the ground stage to get lateral hundreds and actions at site. The steel casing also beat challenges as a result of groundwater through piling. In situations https://cast-in-situ-piles-in-ban79001.elbloglibre.com/32811859/the-2-minute-rule-for-cast-in-situ-piles-in-bangladesh